Home > News > Content

Epoxy Phenolic Resin Reduces The Material Cost

Jun 13, 2020

   Non-layered non-layered steel pipe is usually called non-galvanized steel pipe. Its structural principle is: the bottom layer is sintered epoxy, the middle layer is adhesive, and the surface layer is extruded polyethylene. A steel-jacketed steel directly buried steam thermal insulation steel pipe is a combination of a steel pipe anti-corrosion outer casing steel pipe and ultra-fine glass wool filled between the steel pipe and the outer casing steel pipe. It can also be composed of a graphite silicon calcium shell and a filled polyurethane foam. . Hot dip zinc is also used to prevent corrosion. Anti-corrosion steel pipe, anti-corrosion steel pipe home, internal and external anti-corrosion steel pipe price of cement mortar anti-corrosion steel pipe for urban drainage L spiral steel pipe epoxy coal asphalt anti-corrosion steel pipe high temperature direct buried insulation pipe QB seamless steel pipe epoxy resin anti-corrosion steel pipe QB straight seam steel pipe seamless steel pipe L straight seam steel pipe directly buried thermal insulation steel pipe thick-walled seamless steel pipe L straight seam steel pipe price of urban mortar anti-corrosion steel pipe for urban drainage Price of urban mortar anti-corrosion steel pipe for urban drainage In recent years, pumping bricks are quite common, and there is no difficulty in on-site pouring. The construction method of creating and widely used high-level throwing and vibration-free concrete simplifies the concrete pouring process on site and simplifies construction. Oxycoal asphalt coatings are divided into epoxy coal asphalt primers and epoxy coal asphalt topcoats according to their functions. The above is the introduction of the process of e anti-corrosion steel pipe, I hope to help everyone.


   There is also a method of temporarily pouring holes in the lower part of the pipe column, and pouring concrete from the bottom up with a concrete pump, which is fast and ensures the quality of the irrigation. Textured steel pipe mainly refers to stainless steel seamless steel pipe and stainless steel welded steel pipe. It is not used in the outdoor large and medium pipeline water supply due to cost, connection and other reasons. It is characterized by high strength, corrosion resistance, acid and alkali resistance, and long service life. According to the actual situation, mainly polyethylene and high-density polyethylene, Vicat softening point is set to not less than ℃. This epoxy coal pitch primer is a solvent-based product. The spiral welded steel pipe unit is mainly used for the production of steel pipe outer diameter, the wall thickness is ~mm, and the length is m. Steel pipes for conveying pipelines, pipe piles and pipes for certain mechanical structures.


   Moreover, after pouring, the steel pipe is in a fairly stable humidity condition, the water is not easy to evaporate, the watering curing process is omitted, and the concrete curing process is simplified. The layer type now has a metal layer type and a non-metal layer type, and the metal layer type commonly includes a surface plating layer type and a surface pressure layer type. The first problem of the pipe of the directly buried pipeline is the reliability of tight waterproofing. In addition, it must have good mechanical strength. The steel casing is welded due to its high strength. The waterproof sealing performance is very reliable. In addition, its high temperature resistance is also other. Compared with the external management. The specifications of spiral welded steel pipes now produced can reach mm in outside diameter. Do you know what are the uses of epoxy coal asphalt anti-corrosion? This product can be used as anti-corrosion coating for the outer wall of seawater or fresh water pipelines, anti-corrosion coating for the outer walls of underground oil pipelines, anti-corrosion coatings for the outer walls of thermal pipelines, sluices, as well as sewage treatment tanks, storage tanks, and coal mines. Do you know what are the uses of epoxy coal asphalt anticorrosion? This product can be used as anticorrosion for the outer wall of seawater or freshwater pipelines, anticorrosion for the outer wall of underground oil pipelines, outer wall of thermal pipelines, antiseptic for floodgates, and can also be used as sewage treatment tanks and storage tanks. , Anti-corrosion finishes such as coal mine shaft derricks, etc. are used in the coating of the outer wall of the pipeline, and they are used in conjunction with glass fiber cloth to form a reinforced or special reinforced coating with excellent corrosion resistance. The concrete-filled steel tube column has fewer parts, fewer welds, and a simple structure. The column foot often uses a plug-in column foot with a cup opening on the foundation of the stick. The epoxy resin is relatively simple to manufacture, and the weight of the component is small. The transportation and hoisting are also relatively easy, and the construction is very simple. Moreover, the steel pipe wonconite column is rolled with a sheet, the thickness of the sheet is not large, generally within m, no matter whether the welding is carried out and the site is docked, there is no difficulty.


Production method: Large-diameter spiral welded pipe (double-sided submerged arc spiral welded pipe) is a spiral seam steel pipe that is made of steel coiled plate as a raw material and is often extruded and welded by automatic double-wire submerged arc welding process. The raw material is Strip coil, welding wire, flux. The coating is widely used for anticorrosion and leakage of underwater steel structures and cement components, the protection of underground pipelines and the lower tank of the gas holding cabinet; the anticorrosion of various machinery in coastal areas and salt fields in high temperature areas, and the anticorrosion of the inner and outer walls of chemical and other pipelines. The paint has the advantages of excellent coal tar pitch water resistance and corrosion resistance, good adhesion of epoxy resin paint, tough paint film, high mechanical strength, and good chemical resistance. The effective anti-rust paint pigment is added to the primer, and it is resistant to salt spray for more than 1000h ; Humidity and heat resistance above 1000h. You don’t know that 3pe anti-corrosion steel pipe is the same as the role of anti-corrosion, and it still depends on the installation of chemicals and natural gas. The second part introduced Hebei 3pe anti-corrosion spiral steel pipe. The overall type of expenses required. As consumption upgrades and chemical materials exhibitions drive pipeline upgrades, the future of large-diameter spiral steel pipes, thick-wall spiral steel pipes and corrosion-resistant spiral steel pipes will increase the proportion of demand. The single-layer epoxy powder of PE anti-corrosion steel pipe fundamentally guarantees the anti-corrosion effect of the anti-corrosion steel pipe, and then the next process is carried out. The adhesive three-layer structure polyethylene anti-corrosion layer (PE) combines the sintered epoxy powder coating and The excellent properties of the two extruded polyethylene anti-corrosion layers combine the interface and chemical resistance of the sintered epoxy powder coating with the mechanical properties of the extruded polyethylene anti-corrosion layer, which significantly improves their performance . Before input, it must undergo strict physical and chemical tests. At the same time, compared with the key-reinforced concrete column, the outer steel tube of the concrete-filled steel tube column has the function of reinforcement, and has the function of longitudinal reinforcement and transverse stirrups, so there is no reinforcement in the tube, saving a series of processes such as steel cutting and binding. And because the column sheathed steel pipe itself is resistant to side pressure, it also saves the process of supporting the mold and the mold.


   Strip steel head and tail butt joint, using single wire or double wire submerged arc welding, after coiling into steel pipe, automatic submerged arc welding repair welding. The dense layer of water and gas barrier formed by the cement mortar lining of the water supply steel pipeline depends on the degree of close combination of the cement mortar and the steel pipeline. The thickness of the outer anti-corrosion layer is determined based on low and medium density polyethylene. Before forming, the strip steel is leveled, trimmed, planed, surface cleaned and conveyed, and pre-bent. The organization of the 3pe anticorrosive spiral steel pipe house in Hebei: the anticorrosive steel pipe is the organization of the mother pipe and the anticorrosion layer. Some of the mother pipes are pipes or seamless steel pipes like this, and the anticorrosion layer is 3pe anticorrosion. At the same time: the total cost of Hebei 3pe anti-corrosion spiral steel pipe house: the required cost of 3pe anti-corrosion steel pipe is from the mother tube and the 3pe anti-corrosion layer is the total cost of these steps. Before the few purchasers put in the flowers, they often ask for a meter to pay or a ton to pay. You choose the actual beautiful design of the spiral steel tube like this to implement the umbrella.


Through practical analysis, there are three kinds of forces that play an important role, namely, the force of shrinking the volume of the cement mortar when it is hardened and clinging to the inner surface of the steel pipe, the gel force formed by the hydration of cement particles on the inner surface of the steel pipe, and the reason The mechanical bite force generated by the roughness of the steel pipe and the mortar, the effect of the mechanical centrifugal construction for small and medium pipe diameters is particularly obvious. Because the thickness of the mortar lining layer is small, it is formed at a time after centrifugation. These three forces make the mortar lining layer firm Attached to the tube. In areas with high groundwater levels, in order to ensure that groundwater does not affect the normal operation of directly buried steam pipelines, the outer layer* adopts a solid and sealed steel pipe shell. The first process of hot dip zinc is pickling to remove rust, then cleaning. The common type of surface coating layer is galvanized pipe. There are cold galvanized pipe and hot galvanized pipe. The hot galvanized pipe is still widely used because of the dense and uniform layer, strong adhesion and good stability. In the mechanical spraying of large-caliber steel pipeline cement mortar lining, usually the lining layer is thicker. The thickness of the DN steel pipe mortar lining is mm.) The binding force of the mortar layer and the steel pipe is obviously limited. The electric contact pressure gauge is used to control the pressure of the oil cylinder on both sides of the conveyor to ensure the smooth transportation of the strip.


Common welding problems of anti-corrosion steel pipes The common weaknesses in general steel pipe welds are: incomplete penetration, pores, slag inclusions, etc. The epoxy resin is only based on the change in the shape of the defect wave obtained on the fluorescent screen and the height of the reflected wave. Common welding problems of position and welders on error-proof anti-corrosion steel pipes. Common weaknesses in general steel pipe welds are: under-penetration, pores, slag inclusions, etc., only according to the change of the shape of the defect wave obtained on the fluorescent screen and the height of the reflected wave. The location of the break and the welder comprehensively estimate the error. Using external control or internal control roll forming. The cold-galvanized pipe is not dense and uniform, and has poor stability. It generally rusts in less than a year, and "red water" and "water" appear. The IPN drinking water anti-corrosion steel pipe has a serious iron smell, and various harmful bacteria exceed the quality of life. Standards have been used in domestic water supply pipelines. The main factor of the spiral pipe caused by the wrong side of the steel pipe is the sickle bend of the steel belt. In the formation of the spiral welded pipe, the sickle bend of the steel belt will continuously change the forming angle, causing the weld gap to change, resulting in seams, wrong edges or even overlapping. The dredged steel pipe emerged from the spray booth. The epoxy resin moved the steel pipe to the chain step drying bed after drying out of the transfer mechanism. The steel pipe had already dried when it encountered the spray table. Epoxy coal asphalt anticorrosion coating for internal and external anti-corrosion pipelines for drainage consists of two main components of epoxy and coal asphalt. It is a two-component coating of A (epoxy) and B (curing agent), which has excellent adhesion, toughness and moisture resistance. Water-resistant and chemical-resistant medium, it has the properties of preventing various ions from passing through the paint film, and has the characteristics of expansion and contraction with the coated object. The polyurethane insulation pipe is divided into three layers from the inside to the outside. The direct-buried high-temperature steam prefabricated insulation pipe is a kind of pipeline directly buried underground. It can also be buried directly underground without a concrete structure, that is, the working steel pipe. Thermal expansion takes place in the outer tube, which reduces the material cost, shortens the construction date, and guarantees the safety of the heating pipeline. It can be safely and widely used in different temperature environments, especially suitable for high-temperature steam pipeline projects.


       Source:www.up-resin.com

Back